PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg 2nd floor motorized dampers delivery.jpg Continued laying out block at the 1st floor sprinkler room Facing South.jpg Erecting the stone panels at the North Elevation UCIA roof Facing East.jpg Installed door frames at the 2nd floor Facing North.jpg Installed door frames at the 2nd floor Facing South.jpg Installed electrical split wire above the ceiling at the 1st floor Facing West.jpg
Previous pageNext page Continued laying out block at the 1st floor sprinkler room Facing South
Continued laying out block at the 1st floor sprinkler room Facing South